显示标签为“erw carbon steel pipe”的博文。显示所有博文
显示标签为“erw carbon steel pipe”的博文。显示所有博文

2016年11月10日星期四

Petro China and Malaysia has sighed Sabah Natural Gas Pipeline Project

On the afternoon of November 1, 2016, under the witness of Premier Li Keqiang and Malaysian Prime Mnister Najib Razak, The deputy general manageer of China National Petroleum Corporation (CNPC) Liu Hongbin and the Chairman of Strategic Energy Co., Ltd of Sulia Mohammad Evan Seriga Abu, on behalf of the two companies, have dual signed the Contract for the Construction and Trail Operation of Sabah Gas Pipeline Project and the Contract for Construction and Commissioning of Multu-medium Pipeline Project in Beijing.

Sabah gas pipeline and multi-media pipeline is the Malaysian federal government-led projects. Under the agreement, China Petroleum Pipeline Bureau will EPCC way to undertake the construction of these two pipeline projects.

2016年11月7日星期一

How to Weld for the ERW Steel Pipe in Winter

To ensure that the erw steel pipe in the winter welding perfect follow the following steps:
First, increase the welding current welding, slow down the welding speed, the appropriate increase in the cross-sectional area and length of the weld, if necessary, preheat.
Second, not outside the groove on the base metal to start arc, arc extinction to be filled when the pit.
Third, as far as possible not in low temperature conditions for bending, correction and assembly weldments.
Fourth, preheating before welding, welding process to strictly maintain the interlayer temperature should not be lower than the preheating temperature.
Fifth, the use of low hydrogen or ultra-low hydrogen welding materials.
Six, the entire weld should be finished as far as possible to avoid interruption.