SAE/AMS Specifications Sheet
SAE-J356 Welded Flash Controlled Low Carbon Steel Tubing Normalized for Bending. Double Flaring and Beading.
Covers normalized electric resistance welded tube ID flash-controlled .005" to .010" manipulative quality.
SAE-J524 Seamless Low Carbon Steel Tubing Annealed for Bending and Flaring.
Covers cold drawn seamless JIC hydraulic line tubing.
SAE-J525 Welded and Drawn Low Carbon Steel Tubing Annealed for Bending and Flaring.
Covers welded and drawn JIC hydraulic line tubing.
SAE-J526 Welded Low Carbon Steel Tubing.
Covers annealed welded tube with ID flash-in for general automotive applications.
SAE-J527 Brazed Double Wall Carbon Steel Tubing.
Covers copper brazed double wall low carbon steel tube intended for general automotive applications and other similar uses. Suitable for bending, forming and double flaring.
SAE-J529 Fuel Injection Tubing.
Covers low carbon steel tube specially manufactured for high pressure fuel injection lines for diesel engines.
AMS-5050 Seamless Annealed Low Carbon Steel Tube.
Covers cold drawn seamless JIC hydraulic line steel tubing for aircraft applications.
AMS-5062 Seamless Low Carbon Steel Tube.
Covers cold finished or hot finished seamless low carbon mechanical steel tube.
AMS-6360 Seamless SAE 4130 Alloy Steel Tubing.
Covers aircraft quality 4130 tube in condition N temper. Similar to MIL-T-6736 specification.
AMS-6365 Seamless SAE 4135 Alloy Steel Tubing.
Covers aircraft quality 4135 tube in condition N temper. Similar to MIL-T-6735 specification.
AMS-6371 Seamless SAE 4130 Alloy Steel Mechanical Tubing.
Covers electric furnace grade magnaflux quality 4130 aircraft tube, either hot finished or cold finished, hardenable.
AMS-6372 Seamless SAE 4135 Alloy Steel Mechanical Tubing.
Covers electric furnace grade magnaflux quality 4135 aircraft tube, either hot finished or cold finished, hardenable.
AMS-6381 Seamless SAE 4140 Alloy Steel Mechanical Tubing.
Covers electric furnace grade magnaflux quality 4140 aircraft tube, either hot finished or cold finished, hardenable.
AMS-6415 Seamless SAF 4340 Alloy Steel Mechanical Tubing.
Covers electric furnace grade magnaflux quality 4340 aircraft tube, either hot finished or cold finished, hardenable.
2016年11月15日星期二
The Safe Ways to Use Scaffolding System and Tubes
In high-rise building construction, every step outside the frame to be paved with bamboo basketry or steel fabric, in addition to deaden 1 m high railing and standing bamboo basketry board. On the outer edge of the scaffold, set up safety set net.
Second, the floor protection measures. Now most of the high-rise buildings are concrete frame constructions, widespread adoption MS pipe scaffolding support steel formwork construction. In order to do the protection of the floor construction, can use floor frame. Guard is equal to the height of the two floors of the building, protecting frame width is equivalent to the length of the building a studio.(floor care on the scaffolding tube can prevent falling to the lateral personnel construction, can also be used as a construction safety channel.)
Three, floor slanted protective measures Some concrete frame building, caused by a lack of hoisting equipment, inconvenient installation floor frame, using steel formwork support. Preferably in the surrounding buildings, the erection slanted plane, vertical height and construction of building height, the same set-up of ledger, carry on oblique one safety net. (the floor is slanted frame, also can prevent the staff falling to the outside, but in the build-up to pick frame, workers have to switch seat belt) four, socket frame protection measures.
Some high-rise building, using the plug in or the ingate cast-in-place reinforced concrete shear wall construction method, in order to ensure the safety of construction personnel. Tool type socket frame can be used, the height of the socket frame over a layer of floor, can prevent the construction layer surrounding the staff fall outward.
2016年11月13日星期日
Vietnam steel industry has high growth potential
According to the Viet Nam Steel Association, the country's steel industry has great development potential. Speaking at a seminar titled "Viet Nam's steel industry – rise and fall and development potential" in HCM City on Monday, Dr Nguyen Van Sua the association's vice chairman said that per capita consumption in Viet Nam is 200kg, below the world average of 216kg. he said that "In an industrialised economy, the per capita consumption ranges from 500kg to 600kg."
2016年11月10日星期四
Petro China and Malaysia has sighed Sabah Natural Gas Pipeline Project
On the afternoon of November 1, 2016, under the witness of Premier Li Keqiang and Malaysian Prime Mnister Najib Razak, The deputy general manageer of China National Petroleum Corporation (CNPC) Liu Hongbin and the Chairman of Strategic Energy Co., Ltd of Sulia Mohammad Evan Seriga Abu, on behalf of the two companies, have dual signed the Contract for the Construction and Trail Operation of Sabah Gas Pipeline Project and the Contract for Construction and Commissioning of Multu-medium Pipeline Project in Beijing.
Sabah gas pipeline and multi-media pipeline is the Malaysian federal government-led projects. Under the agreement, China Petroleum Pipeline Bureau will EPCC way to undertake the construction of these two pipeline projects.
Sabah gas pipeline and multi-media pipeline is the Malaysian federal government-led projects. Under the agreement, China Petroleum Pipeline Bureau will EPCC way to undertake the construction of these two pipeline projects.
In Stock ERW Steel Pipe Price 2016/11/11
API 5L/A53 GR.B, ERW Steel Pipe, Carbon Steel | ||||||
Outside Diameter | Wall Thickness | Length | Quantity 数量 | Remark 标记 | EXW CHINA 出厂价 | |
外径 (mm) | 壁厚 (mm) | 长度 (mtr) | PCS 根数 | TON 吨位 | Surface,End | USD/TON 美金每吨 |
168.3 | 7.5 | 5.8 | 50 | 14.24 | BE. BARE | $515.82 |
355.6 | 6.8 | 6.5 | 75 | 10.86 | BE. BARE | $546.80 |
508.0 | 13.0 | 12 | 6 | 2.94 | BE. BARE | $560.27 |
114.3 | 9.5 | 6 | 30 | 14.30 | BE. BARE | $583.16 |
273.0 | 8.5 | 11.8 | 30 | 54.91 | BE. BARE | $518.52 |
139.7 | 4.9 | 6.5 | 23 | 2.55 | BE. BLACK | $507.74 |
219.1 | 10.5 | 6 | 56 | 22.20 | BE. BLACK | $531.99 |
273.0 | 9.3 | 12 | 23 | 17.04 | BE. BLACK | $523.91 |
355.6 | 12.7 | 6 | 30 | 13.10 | BE. BLACK | $565.66 |
406.4 | 6.4 | 12 | 70 | 40.75 | BE. BLACK | $552.19 |
33.4 | 3.5 | 6 | 132 | 2.04 | BLACK | $504.62 |
48.3 | 4.25 | 6 | 56 | 1.55 | BLACK | $516.92 |
73 | 5.5 | 6 | 42 | 2.31 | BLACK | $523.76 |
76.1 | 5.5 | 6 | 110 | 6.32 | BE. BLACK | $521.03 |
108 | 6.5 | 6 | 59 | 5.76 | BLACK | $552.48 |
127 | 5.6 | 6 | 73 | 7.34 | BE. BLACK | $501.48 |
133 | 7.7 | 6 | 142 | 20.27 | BLACK | $493.68 |
152 | 4.3 | 6 | 230 | 21.61 | BE. BLACK | $497.48 |
165 | 6.0 | 6 | 114 | 16.09 | BE. BLACK | $505.98 |
168.3 | 3.5 | 6 | 165 | 14.08 | BLACK | $490.94 |
26.7 | 2.87 | 6.1 | 198 | 2.04 | BLACK | $507.94 |
42.2 | 3.56 | 6 | 345 | 7.02 | BLACK | $498.58 |
48.3 | 3.7 | 5.8 | 129 | 3.03 | BLACK | $489.22 |
33.4 | 3.9 | 5.8 | 432 | 7.12 | BE. BLACK | $489.22 |
73 | 3.4 | 5.8 | 368 | 12.39 | BE. BLACK | $498.58 |
159 | 6.0 | 6.1 | 123 | 16.99 | BE. BLACK | $481.20 |
273 | 9.3 | 6.1 | 301 | 110.70 | BE. BLACK | $514.62 |
133 | 6.5 | 5.8 | 220 | 25.87 | BE. BLACK | $485.21 |
178 | 8.0 | 5.8 | 206 | 40.07 | BE. BLACK | $491.90 |
168.3 | 7.1 | 6 | 188 | 31.88 | BE. BLACK | $490.56 |
Note: 1. The above price is based on bare pipe, for extra coating, please contact sales@primesteeltube.com; | ||||||
2. The above price is based on EXW, for FOB/CIF/CFR price, please contact sales@primesteeltube.com; | ||||||
3. The above price is not including any packing and end processing charge, for detailed quotation, please contact sales@primesteeltube.com; | ||||||
4. The above price is only valide during NOV 11- 18; | ||||||
5. The applicapable MOQ for this price list is over 25 tons; |
2016年11月8日星期二
Difficulties in Wall Thickness Control for Straight Seam Steel Pipe Process
Straight seam steel pipe wall thickness control is a difficult production. At present, the straight seam steel pipe manufacturers to improve the wall thickness in the production of precision uses the methods generally including:
1, Tube heating
Heating to the average to prevent rapid up and down temperature. Each take-off and landing temperature is to maintain a smooth slow, the maximum rise and fall temperature does not exceed 30 ℃.
2, Rolling mill mandrel
Average wall thickness of thick wall tube and solid billet make the probability of mandrel bending deformation significantly reduced, can effectively improve the wall thickness of the precision.
3, The accuracy of mandrel
The outer core of the machining accuracy control in ± 0.1mm, mandrel straightness bias does not exceed 5mm. Welding, the two core rods between the piercing a finishing pin positioning, welding in order to avoid the formation of the total straightness bias is too large.
4, The perfect process
Determing whether the centering roll device in place, adjust the relevant core roller in the middle, open the angle and the size of the initiative of the same opening, the middle of the rolling core in the rolling line.
5, Centering roller
Perfect process is to avoid the center pull thin and wall thickness beyond the control limitations of the state of attack, improve wall thickness accuracy.
6, Perforated mandrel
General choice of perforated mandrel diameter Φ108mm-Φ114mm, wall thickness requirements ≥ 25mm and wall thickness of the average thick-walled tube.
7, Rolling the middle line
Making sure that the middle line of the piercing mill is consistent with the middle line of the piercing trolley to prevent "upper rolling" or "lower rolling", so that the billet sticks to the average force during the piercing.
8, Rolling things
On the wear of the head, guide, roll and other rolling things to be real-time change.
9, Rolling things device
Roller distance, the distance must be in the middle of the rolling line. Guaranteed the distance between the guide and the middle of the roller in the middle of the piercing rolling, the upper and lower roller equal to the left and right lead from the same.
1, Tube heating
Heating to the average to prevent rapid up and down temperature. Each take-off and landing temperature is to maintain a smooth slow, the maximum rise and fall temperature does not exceed 30 ℃.
2, Rolling mill mandrel
Average wall thickness of thick wall tube and solid billet make the probability of mandrel bending deformation significantly reduced, can effectively improve the wall thickness of the precision.
3, The accuracy of mandrel
The outer core of the machining accuracy control in ± 0.1mm, mandrel straightness bias does not exceed 5mm. Welding, the two core rods between the piercing a finishing pin positioning, welding in order to avoid the formation of the total straightness bias is too large.
4, The perfect process
Determing whether the centering roll device in place, adjust the relevant core roller in the middle, open the angle and the size of the initiative of the same opening, the middle of the rolling core in the rolling line.
5, Centering roller
Perfect process is to avoid the center pull thin and wall thickness beyond the control limitations of the state of attack, improve wall thickness accuracy.
6, Perforated mandrel
General choice of perforated mandrel diameter Φ108mm-Φ114mm, wall thickness requirements ≥ 25mm and wall thickness of the average thick-walled tube.
7, Rolling the middle line
Making sure that the middle line of the piercing mill is consistent with the middle line of the piercing trolley to prevent "upper rolling" or "lower rolling", so that the billet sticks to the average force during the piercing.
8, Rolling things
On the wear of the head, guide, roll and other rolling things to be real-time change.
9, Rolling things device
Roller distance, the distance must be in the middle of the rolling line. Guaranteed the distance between the guide and the middle of the roller in the middle of the piercing rolling, the upper and lower roller equal to the left and right lead from the same.
2016年11月7日星期一
How to Weld for the ERW Steel Pipe in Winter
To ensure that the erw steel pipe in the winter welding perfect follow the following steps:
First, increase the welding current welding, slow down the welding speed, the appropriate increase in the cross-sectional area and length of the weld, if necessary, preheat.
Second, not outside the groove on the base metal to start arc, arc extinction to be filled when the pit.
Third, as far as possible not in low temperature conditions for bending, correction and assembly weldments.
Fourth, preheating before welding, welding process to strictly maintain the interlayer temperature should not be lower than the preheating temperature.
Fifth, the use of low hydrogen or ultra-low hydrogen welding materials.
Six, the entire weld should be finished as far as possible to avoid interruption.
First, increase the welding current welding, slow down the welding speed, the appropriate increase in the cross-sectional area and length of the weld, if necessary, preheat.
Second, not outside the groove on the base metal to start arc, arc extinction to be filled when the pit.
Third, as far as possible not in low temperature conditions for bending, correction and assembly weldments.
Fourth, preheating before welding, welding process to strictly maintain the interlayer temperature should not be lower than the preheating temperature.
Fifth, the use of low hydrogen or ultra-low hydrogen welding materials.
Six, the entire weld should be finished as far as possible to avoid interruption.
订阅:
博文 (Atom)